Many of the General Contractors we support face challenges to keep their projects on time and on budget. We have helped these GCs to accelerate their construction schedule, reduce costs and enhance jobsite productivity.
We are different because our technology reduces the need for skilled labor, eliminates application errors, and speeds up construction.
Are you looking for:
• Products proven to accelerate construction schedules
• Silica dust-free concrete hardening for better worksite safety
• An easy application process
• Technical support and industry-leading warranties
For more than 45 years, we have worked with architects, engineers, and builders to build dry and durable structures.
Known nowadays as an award-winning showpiece of architecture, construction, and sustainability, the Vancouver Convention Centre only came to pass through the help of Hard-Cem. With it, the construction team gave it the full-depth hardening it needed to increase its lifespan and its LEED points and reduce its need for maintenance.
To ensure they could transport 100,000 tons of peas yearly from their state-of-the-art facility, Roquette wanted to build a durable transportation tunnel. Initially, they used a dry shake hardener to accomplish this. But they had troubles with its application. The general contractor noticed this and replaced the dry shake with Hard-Cem.
Marina Bay Sands is Asia Pacific’s largest integrated resort which has distinguished Singapore from other cities. Their challenge was to find a waterproofing solution to accommodate the varying needs of this mega-project including all below-grade areas, multiple floors, tunnels, rooftops, lift, sump pits and water tanks.
Submit the following form, and one of our representatives will get back to you to discuss your project needs.