Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • Sustainability & LEED
    • Courses
    • Brochures
    • Videos
  • Blog
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • eNewsletter
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

Media

News

  • Media
  • News
  1. <
  2. 1
  3. ...
  4. 32
  5. 33
  6. 34
  7. 35
  8. 36
  9. 37
  10. 38
  11. 39
  12. 40
  13. >

Filling Holes

December 20, 2007

Concrete Surface – Winter 2007 A waterproofing treatment was the answer for a large reservoir project Managers required a timely and cost-effective solution for waterproofing the reservoir slab at the Lacombe Park Reservoir in St. Albert, Alberta.

Kryton > Media > News

Select the Right Solutions

December 16, 2007

Construction World – December, 2007 Leo Connell on waterproofing for the Al Mashfa Hospital by the Red Sea. The Al Mashfa Group, a respected medical company in the Middle East, built a 10-storey full-service private hospital in Jeddah, just 1 km from the shore of the Red Sea.

Kryton > Media > News

Keeping the Water In (and Out) at YVR

December 10, 2007

The Vancouver Specifier – December 2007 How An Innovative Crystalline Waterproofing Product Solved YVR Aquarium’s Toughest Challenges

Kryton > Media > News

Mega garage in Kuwait for ICW protection

November 15, 2007

Gulf Construction – November, 2007 Integral crystalline waterproofing (ICW) provides life-long protection of structures, says LEO CONNELL,” while outlining properties of the system which appealed to the builders of one of the world’s largest garages.

Kryton > Media > News

State-of-the-Art Crystalline Technology Revolutionizes Concrete Waterproofing

October 22, 2007

Arab Construction World – October, 2007 An innovative technology is changing the way concrete structures around the world are waterproofed and repaired. Used for more than 30 years worldwide, “Integral Crystalline Waterproofing (ICW)” utilizes a chemical reaction to turn concrete into a permanent, waterproof barrier.

Kryton > Media > News

“All About Krystol Waterproofing System That Stops Leakage Permanently”

October 12, 2007

Civil Engineering and Construction Review – October, 2007 CE&CR: What are the problems due to cracking of concrete? U.K.K.: Cracks help in the penetration of water carrying soluble salts through them. The penetrated soluble salts may corrode reinforcement. This reduces the life span of the structure.

Kryton > Media > News

A Little Help

September 28, 2007

The Concrete Producer – September 2007 Every newcomer is a little nervous at his first association meeting. “Get over the shyness,” says Kari Yuers, president and CEO of Kryton Group of companies, Vancouver, British Columbia.

Kryton > Media > News

Kryton Group celebrates grand opening of new facility

September 27, 2007

Journal of Commerce – September, 2007 The sound of the live rock music from band Nearly Neil cemented the grand opening of the Kryton Group of Companies’ new 35,000-square foot manufacturing, warehouse and office building on East Kent Ave. Sept. 14 with more than 200 clients turning up to dance, dine and do the plant … Read More

Kryton > Media > News

Kari Yuers’ concrete business plan

September 11, 2007

Business in Vancouver – September, 2007 Her family’s Kryton International Inc. has pioneered a growing global construction sector market for the company’s waterproofing technology

Kryton > Media > News

Association News

July 27, 2007

Concrete Repair Bulletin – July/ August, 2007 Kari L. Yuers was appointed President and Chief Executive Officer of the Kryton Group of Companies, Vancouver, British Columbia, Canada, in 2001 after serving the company in a number of capacities, including General Manager and Vice President, Technical Services, for 10 years.

Kryton > Media > News
  1. <
  2. 1
  3. ...
  4. 32
  5. 33
  6. 34
  7. 35
  8. 36
  9. 37
  10. 38
  11. 39
  12. 40
  13. >
Contact UsNewsletter Signup

No Tweets available.

Kryton Concrete Blog Kryton on Facebook Kryton on Twitter Kryton on LinkedIn Kryton on YouTube

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2025 Kryton International Inc.