Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • Sustainability & LEED
    • Courses
    • Brochures
    • Videos
  • Blog
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • eNewsletter
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

Media

  1. <
  2. 1
  3. ...
  4. 40
  5. 41
  6. 42
  7. 43
  8. 44
  9. 45
  10. 46
  11. 47
  12. 48
  13. >

Association News

July 27, 2007

Concrete Repair Bulletin – July/ August, 2007 Kari L. Yuers was appointed President and Chief Executive Officer of the Kryton Group of Companies, Vancouver, British Columbia, Canada, in 2001 after serving the company in a number of capacities, including General Manager and Vice President, Technical Services, for 10 years.

Kryton > Media > News

Integral Crystalline Technology Revolutions Concrete Repair and Waterproofing

June 8, 2007

The Masterbuilder – June 2007 A UNIQUE CRYSTALLINE TECHNOLOGY is changing the way concrete structures around the world are repaired and waterproofed.  Integral crystalline waterproofing provides a more permanent, cost-effective alternate to conventional waterproofing methods.

Kryton > Media > News

Concrete International – Crack Repair System Stops Water in Its Tracks

May 1, 2007

Crack Repair System Stops Water in Its Tracks Integral crystalline waterproofing protects space below suspended swimming pool Concrete International – May 2007 Even before its completion, concrete cracks threatened the successful opening of the Aura Tower, a new luxury high-rise in Zapopan, Mexico. With the grand opening fast approaching, workers found that the facility’s swimming … Read More

Kryton > Media > Media Releases

Crack Repair System Stops Water in Its Tracks

May 1, 2007

Concrete International – May 2007 Even before its completion, concrete cracks threatened the successful opening of the Aura Tower, a new luxury high-rise in Zapopan, Mexico. With the grand opening fast approaching, workers found that the facility’s swimming pool had numerous shrinkage cracks (Fig. 1) that were allowing water to leak into the structure below.

Kryton > Media > News

Laying a strong foundation

April 6, 2007

Construction World – April 2007 Your site has been excavated and the foundation footings placed. You’re ready to begin the formwork and pour the concrete. Or are you? The excavation has left little room to strip the forms, much less apply a water or damp-proofing membrane after surface preparation.

Kryton > Media > News

Congratulations to Kari Yuers for her recent ACI appointment!

April 1, 2007

  Kari has been appointed to the American Concrete Institute’s (ACI) Board of Direction. Her position as a Director was announced at the ACI’s Spring Convention in Atlanta, Georgia.

Kryton > Media > Media Releases

Integral Crystalline Waterproofing at Work in Dubai

March 16, 2007

Arab Construction World – March 2007 Knowledge Village is an upscale area in Dubai located close to Internet City, Media City and the Dubai Marina. The Village is well known for representing some of the world’s most reputed academic institutes and colleges in one geographical area. Inside Knowledge Village, next to Sheikh Zayed Road, (one … Read More

Kryton > Media > News

Kryton Expands Technical Headquarters to Meet Growing Demands

March 12, 2007

To meet the growing demands of our customers, Kryton Technical Headquarters will be moving offices and manufacturing facilities to a new building nearby our current location.

Kryton > Media > Media Releases

Creating a Leak-Free Water Containment Tank

February 27, 2007

Construction World – February/ March 2007 When it comes to preventing water damage and preserving the Integrity of concrete structures, waterproofing is essential. In the case of concrete tanks, however, effective, reliable waterproofing is doubly critical.

Kryton > Media > News

Kryton Sets the Standard for Crystalline Waterproofing in China

January 1, 2007

This past December (2006), Kryton’s President/CEO Kari Yuers traveled to China to continue Kryton’s mission of educating and informing  the global construction industry about the benefits of “Integral Crystalline Waterproofing”.

Kryton > Media > News
  1. <
  2. 1
  3. ...
  4. 40
  5. 41
  6. 42
  7. 43
  8. 44
  9. 45
  10. 46
  11. 47
  12. 48
  13. >
Contact UsNewsletter Signup

No Tweets available.

Kryton Concrete Blog Kryton on Facebook Kryton on Twitter Kryton on LinkedIn Kryton on YouTube

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2025 Kryton International Inc.