Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • Sustainability & LEED
    • Courses
    • Brochures
    • Videos
  • Blog
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • eNewsletter
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

Projects: Case Studies

Case Study Library

Search using the fields below to find a project.

Reset Search Filter
Location: Bagsværd, Denmark
Contractor: Zacho-Lind A/S
Download Case Study

Bagsværd Bridge

Bagsværd, Denmark

  • Home
  • Projects
  • Concrete Monitoring
  • Bagsværd Bridge

Simplifying Concrete Temperature Plans and Expediting Construction Schedules

Background

As all contractors know, an efficient construction schedule is a cost-saving schedule. However, sometimes unforeseen events can happen, where construction takes longer than expected. That in turn can reduce the chances of meeting project deadlines while extending the budget, which isn’t likely to impress clients. To avoid this situation and minimize delays to the overall schedule, contractors do their best to capitalize on efficiencies that can save time where possible.

With that in mind, Danish contracting firm Zacho-Lind A/S sought a solution that would provide insight into the strength development of their concrete and help them improve their efficiency while making it easier to document concrete temperature for the construction of the Bagsværd Bridge.

Solution

This search led the contractor to the Maturix Smart Concrete Sensors. With these sensors, the contractor was able to get accurate insights into the strength development of their concrete while also logging temperature data in real time directly to a cloud-based platform. This let the contractor know exactly when their concrete hit critical strength thresholds, allowing them to strip forms quicker and helping them to increase their efficiency in a way that shortened their expected timeline.

To start this new, more efficient process, Zacho-Lind A/S simply set up their project on the cloud-based monitoring platform, fixed industry-standard type K thermocouple wires to the reinforcing steel in the desired positions, and plugged them into the reusable Maturix® Sensors. From there, the sensors transmitted temperature data to the platform, where all data was then logged and could be viewed through a web browser on any connected device. Then, by adding the maturity curve for the concrete mix design, they were able to leverage the non-destructive and highly accurate test method ASTM C1074 — Standard Practice for Estimating Concrete Strength by the Maturity Method. Under this method, the sensors converted the temperature and time data to maturity hours, letting the contractor know the exact strength of their concrete in real time. Using the Maturix Sensors, the contractor was able to simplify their temperature control plan and recognize that they had achieved the target strength of their concrete well before their expected 14 days, allowing them to strip forms seven days earlier. By shaving seven full days off the schedule, the contractor was then able to move on to the next stages of construction, which resulted in completing the Bagsværd Bridge ahead of schedule.


Products and Systems Used:

Concrete Monitoring

Maturix Smart Concrete Sensors wirelessly transmit real-time data on temperature and strength development to your device. It records, monitors and alerts users on the actual status of the concrete which reduces risk, increases efficiency, and saves time and money. Maturix Smart Concrete Sensors are reusable and offer unlimited use for a low fixed cost.

View Details

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2025 Kryton International Inc.