Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • Sustainability & LEED
    • Courses
    • Brochures
    • Videos
  • Blog
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • eNewsletter
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

Projects: Case Studies

Case Study Library

Search using the fields below to find a project.

Reset Search Filter
Location: Lillooet, Canada
Owner: BC Hydro
Contractor: WRDE Management Ltd.

Bridge River Hydroelectric Complex

Lillooet, Canada

  • Home
  • Projects
  • Dams
  • Bridge River Hydroelectric Complex

Background

BC Hydro’s Bridge River complex, located near Lillooet, British Columbia, Canada, consists of three distinct components, the Bridge River powerhouses, the La Joie Dam and Generating Station, and the Seton Generating Station.  Being the third largest development in the BC Hydro system, the operation and upkeep of these facilities is important for supplying power to the people of British Columbia.

With the majority of the infrastructure and facilities being built around the 1950s, the concrete is showing signs of aging, including cracks, spalls, AAR deterioration, and wetting-drying/freeze-thaw deterioration.  BC Hydro could see increased downtime and maintenance costs, as well as face huge replacement costs over the next several years if they were not proactively looking at ways to restore and protect this concrete. 

BC Hydro has been using Kryton International Inc.’s products since the mid-1980s to waterproof and protect their concrete structures throughout British Columbia.  Although they have numerous success stories with using products like Krystol T1 & T2 Waterproofin System and the Krystol Crack Repair System, they were interested in products that would provide good protection and provide a nice aesthetic finish.

Solution

Knowing that Kryton thrives on providing innovative solutions, contractors approached Kryton’s Product Development Team to see what type of solutions they could come up with.  Early on, Kryton trials were based on a modified version of the current Krystol T1 & T2 Waterproofing System.  However, after numerous brainstorming sessions and formulation changes, Kryton’s Product Development Team came up with the idea to develop a new complete system for restoring and protecting concrete.

Kryton’s new Hydrostop Restore & Protect SystemTM greatly extends the useful life of aging concrete infrastructure and buildings, improves overall aesthetics and offers a more environmentally sustainable alternative to major rehabilitation or total replacement.

“The Hydrostop System is a cost effective way to extend the life of concrete that is showing signs of deterioration due to continual ingress of water” says Rob Emlyn, Project Manager for WRDE Management Ltd.

The systematic approach makes life easier for maintenance engineers and specifiers by offering a complete and compatible system that has been developed to work flawlessly together. There’s no need to piece together a solution based on various products or resolve conflicting application instructions.

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2025 Kryton International Inc.