Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • Sustainability & LEED
    • Courses
    • Brochures
    • Videos
  • Blog
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • eNewsletter
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

Projects: Case Studies

Case Study Library

Search using the fields below to find a project.

Reset Search Filter
Location: Hamilton, ON, Canada
Owner: Effort Trust
Contractor: DeFaveri Construction Inc.
Distributor: Form & Build Supply
Download Case Study

Effort Trust Headquarters

Hamilton, ON, Canada

  • Home
  • Projects
  • Effort Trust Headquarters

Reducing the Time and Work Needed for Waterproofing

Background

In the hopes of promoting their location as a pedestrian and people-friendly area, the City of Hamilton in Ontario, Canada, chose to redevelop Gore Park and the surrounding area. As part of this project, they planned to pedestrianize certain streets, add greenery, and create an internal courtyard. It would ensure that they could better prioritize the comfort and needs of residents and visitors walking through the area while also increasing the neighborhood’s liveliness. To add to this revitalization, the city also planned to add more office, retail, and residential space.

That included the construction of Effort Trust’s new headquarters. Designed to be almost fully encased in dazzling tinted windows, it was going to be a welcome new visual for the area. It was also going to be constructed close to Hamilton Harbour, which posed a problem. With such proximity, the headquarters would have to contend with significant groundwater and hydrostatic pressure. That meant the concrete foundation of the headquarters would need to be watertight to avoid potential water ingress.

Solution

While looking for a solution, the contractor of the project, DeFaveri Construction Inc. got in touch with their Form & Build Supply sales representative. As the two discussed the project, the representative suggested they use Kryton’s waterproofing admixture, KIM.

With KIM, the contractor would be able to expedite construction and save on labor as they would not have to deal with a time-consuming or labor-intensive application process. Instead, a worker could add KIM into the concrete mix during batching in one step to fully waterproof the concrete. It would all be thanks to KIM’s Krystol® technology, which gives concrete the ability to react to the presence of water by forming insoluble, interlocking crystals. These would fill up any spaces that water and waterborne contaminants might try to pass through, protecting the reinforcing rebar from corrosion and keeping the structural integrity of the headquarters intact.

After learning about this, the contractor decided to apply KIM to the foundation of Effort Trust’s new headquarters, feeling confident that they could ensure the concrete there would remain watertight and durable, which has been proven to be true over the years since construction.


Products and Systems Used:

Krystol Internal Membrane™ (KIM®)

Krystol Internal Membrane (KIM) is a hydrophilic crystalline admixture used to create permanently waterproof concrete.

View Details

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2025 Kryton International Inc.