Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • Sustainability & LEED
    • Courses
    • Brochures
    • Videos
  • Blog
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • eNewsletter
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

Projects: Case Studies

Case Study Library

Search using the fields below to find a project.

Reset Search Filter
Location: Victoria, BC, Canada
Owner: Department of National Defence
Engineer: Stantec
Contractor: Stuart Olson Constructors Inc.
Distributor: Brock White Construction Materials
Download Case Study

Fleet Maintenance Facility

Victoria, BC, Canada

  • Home
  • Projects
  • Above Grade
  • Fleet Maintenance Facility

Getting Repeat Specifications to Help Engineers with Demanding Applications

Background

Established as a military installation by the Royal Navy in 1855 and serving the Royal Canadian Navy since 1910, the Canadian Forces Base (CFB) Esquimalt is the second largest military base in Canada. Located in Victoria, British Columbia, the base is also home to Canada’s Maritime Forces Pacific.

To ensure these forces get the ship and ship-related equipment maintenance they need, the Fleet Maintenance Facility Cape Breton (FMFCB) provides the support for it. However, it along with other facilities at CFB Esquimalt’s dockyard, consisting of more than 60 buildings, had been rendered antiquated by modern industrial workplace standards.

In response, a modernization program was proposed: the FMFCB Shop Consolidation Project. This project would consolidate Cape Breton’s new workspace and create approximately 28,000 m2 (300,000 ft2) of new operational space. This upgrade would also streamline the industrial process, transforming the facility into a truly modern space. At the same time, it would make the facility the second largest enclosed building on the North American West Coast, second to the Boeing aircraft facility in the United States of America’s State of Washington.

Moreover, the upgraded facility’s concrete structure would be designed to withstand earthquakes and tsunamis. And more importantly, it needed to be both abrasion- and erosion-resistant. After all, the slabs in the new building would need to survive the exposure to seawater, heavy traffic from the loading and offloading of heavy naval vessel components for repair, and contact with the processes involved with materials handling, manufacturing, welding, fabrication, and assembly.

Solution

The engineer of this undertaking, Stantec, recommended Hard-Cem for the project’s fourth phase.  

They did so because they knew that Hard-Cem offers full-depth concrete hardening to protect concrete from long-term abrasion and erosion and can be used with air-entrained concrete. And its chemically neutral nature means that Hard-Cem can be used with any concrete mix design. Moreover, Hard-Cem’s integral quality allows it to be versatile, enabling applications for vertical, horizontal, inclined, interior, and exterior slabs.

All of which made the concrete hardener’s application a success for the CFB Esquimalt’s upgrade.

With the success of that phase, Stantec again specified Hard-Cem for the fifth phase of the base modernization program, proving that Hard-Cem is the solution for engineers who want high performance in demanding applications.


Products and Systems Used:

Hard-Cem®

Hard-Cem is an Integral Hardening Admixture used to increase Abrasion and Erosion resistance of concrete. Hard-Cem is added to the concrete at the time of batching to increase the hardness of the concrete and extend concrete wear life. It outperforms and overcomes deficiencies of labor intensive surface applied hardeners, and is used to enhance durability...

View Details

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2025 Kryton International Inc.