Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • Sustainability & LEED
    • Courses
    • Brochures
    • Videos
  • Blog
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • eNewsletter
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

Projects: Case Studies

Case Study Library

Search using the fields below to find a project.

Reset Search Filter
Location: Houston, TX, USA
Owner: Houston Airport System
Engineer: CDM Smith
Applicator: Chamberlin Roofing & Waterproofing
Distributor: Builders Products
Download Case Study

George Bush Intercontinental Airport Repair

Houston, TX, USA

  • Home
  • Projects
  • Below Grade
  • George Bush Intercontinental Airport Repair

Providing Blindside Integral Waterproofing for an ITT Tunnel Repair

Background

The George Bush Intercontinental Airport opened in 1969 and has undergone numerous expansions since. Despite those expansions, at some point, groundwater infiltrated the inter-terminal train (ITT) underground tunnel. Because the ITT acted as a passenger train service that connected to all airport terminals and a hotel, immediate repairs were needed. However, Houston Airport System would only have a limited amount of time each night to shut down the ITT to conduct the repairs. So they needed a solution that could be applied to the inside of the tunnel and that could also be effectively applied in short windows of time.

Solution

The repair team chose the Krystol® Leak Repair System and Krystol T1 to provide blindside integral Krystol® crystalline waterproofing, which would address the most severe cracks and leaks that were threatening the tunnel’s serviceability. Moreover, Krystol T1 was also chosen for its ability to penetrate concrete walls and stop water under hydrostatic pressure. The choice was a natural one as the product met the US Army Corps of Engineers’ standards in the project specification, including the ability to reduce the permeability of concrete and increase its chemical resistance.

After selecting such products, the repair team first chiseled a chase for the leaking cracks and applied the fast-setting Krystol Plug, which halted the leaks immediately. Then, they applied Krystol Repair Grout over the plug to permanently stop the water. The team went on to apply some Krystol T1 over the leak repair and to the concrete walls to protect against future water intrusion. The last two products contained Krystol technology, which chemically reacts with water and unhydrated cement particles to form insoluble needle-shaped crystals that fill capillary pores and micro-cracks in the concrete and block the pathways for water and waterborne contaminants. A unique feature of the Krystol technology is its ability to lie dormant indefinitely within the concrete. If a new crack should form and water begins to penetrate the concrete, the technology will react to seal the leaking location, giving the repair and the concrete a self-sealing ability.


Products and Systems Used:

Krystol T1® Concrete Waterproofing

Krystol Leak Repair System

Krystol T1 is a surface applied crystalline slurry treatment that transforms new or existing concrete into a permanent waterproofing barrier.

View Details

Krystol Plug™

Krystol Leak Repair System

As part of the Krystol Leak Repair System, Krystol Plug is a rapid-setting hydraulic cement product that when mixed with water is used to stop flowing water and repair leaking cracks, holes and joints in concrete.

View Details

Krystol Repair Grout™

Krystol Leak Repair System

As part of the Krystol Leak Repair System, Krystol Repair Grout is a crystalline concrete waterproofing product that stops the flow of water to permanently repair leaking cracks, holes and joints in concrete, and can also be used to resurface and waterproof defective, damaged or deteriorating concrete. The grout employs advanced fiber technology and shrinkage controlling additives to prevent cracking.

View Details

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2025 Kryton International Inc.