Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • Sustainability & LEED
    • Courses
    • Brochures
    • Videos
  • Blog
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • eNewsletter
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

Projects: Case Studies

Case Study Library

Search using the fields below to find a project.

Reset Search Filter
Location: Sudbury, ON, Canada
Owner: Province of Ontario
Engineer: AECOM
Contractor/Applicator: Dominion Construction
Ready-Mix Supplier: Rainbow Ready Mix
Distributor: Form & Build Supply
Download Case Study

Maley Dam Restoration

Sudbury, ON, Canada

  • Home
  • Projects
  • Maley Dam Restoration

Extending the Life Span of a Flood Control Dam with Krystol Technology

Background

Flooding is a common risk in most parts of Sudbury, Ontario, making safety and structural protection there a critical concern. Over the years, the Province of Ontario has responded to that concern with a number of flood mitigation methods. One in particular included the construction of the Maley Dam in 1971.

Designed to control flooding, the dam would catch any additional oncoming water, ensuring that it wouldn’t flow over so severely. However, over time, the dam started to show signs of wear. Eventually, one of its side walls had heavily deteriorated.

If left alone, this deterioration would have only continued until Sudbury lost some of its flood protection. Realizing that, the Province of Ontario chose to restore the dam, extending its life span from its existing 50 years to 100 years at the cost of $8.8 million. However, the restoration had a tight schedule and would need to contend with winter weather.

Solution

While restoring this dam was important to the province, the restoration team had to wait until late in the fall season to start. Otherwise, the water levels in the area would have been dangerously high, increasing the risk of damage to the worksite and its workers.

Because of that later start, the team had to prevent the ground around the dam from freezing. If they didn’t, the ground would have eventually thawed and settled, which would have created cracks in the team’s freshly poured concrete. With that in mind, the team planned to keep the area unfrozen with a heating and hoarding process.

Before that could even start, however, the contractor had to determine just how they could increase the longevity and durability of the dam’s spillway and structural side walls. Initially, they had considered cementitious coatings. But those were rejected for their inability to protect or extend the life span of the Maley Dam significantly.

Instead, the contractor turned to Kryton’s KIM and Krystol T1 solutions. Both of which offered the restoration team the ability to use Krystol® technology, which has been proven to last for the life of any given concrete structure and to give that structure better durability and long-term waterproofing. The team would just need to add KIM to the concrete mix and apply Krystol T1 to the surface of the concrete.

From there, the concrete would receive Krystol technology, which remains dormant until water is present. Once water tries to seep through the concrete, the Krystol technology will activate, forming interlocking crystals that fill up capillaries, pores, and micro-cracks in the concrete. That stops water from passing through the concrete and corroding the reinforcing steel within. It also allows the concrete to self-seal hairline cracks, mitigating the need for future repairs.

In short, it was exactly what Maley Dam would need to stay structurally strong for another 50 years while withstanding the occasional high water levels. Knowing that, the restoration team started applying the two solutions. As a result, they added 300 m3 (10,594 ft3) of KIM to the concrete mix to help reinforce the one heavily deteriorated side wall. Through the use of one-sided forming, they then cast in place the KIM-treated concrete and anchored it to that wall. Then, to protect the spillway and other structural side walls, the restoration team coated those areas with 1,672 m2 (18,000 ft2) of Krystol T1.

All of which was done efficiently within the tight construction schedule with the help of local distribution, easy product availability, and immediate site service and inspection, leaving the dam free to control floods effectively once more.


Products and Systems Used:

Krystol Internal Membrane™ (KIM®)

Krystol Internal Membrane (KIM) is a hydrophilic crystalline admixture used to create permanently waterproof concrete.

View Details

Krystol T1® Concrete Waterproofing

Krystol Leak Repair System

Krystol T1 is a surface applied crystalline slurry treatment that transforms new or existing concrete into a permanent waterproofing barrier.

View Details

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2025 Kryton International Inc.