Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • Sustainability & LEED
    • Courses
    • Brochures
    • Videos
  • Blog
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • eNewsletter
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

Projects: Case Studies

Case Study Library

Search using the fields below to find a project.

Reset Search Filter
Location: Kamloops, BC, Canada
Owner: New Gold Inc.
Download Case Study

New Afton Mine

Kamloops, BC, Canada

  • Home
  • Projects
  • New Afton Mine

Reducing a Mine’s Lifetime Carbon Footprint by 49.5%

Background

New Gold Inc.’s New Afton Mine near Kamloops in British Columbia, Canada, was built in 2011 and opened in 2012. As part of its mining operation, it employs the block-caving method. Because of that, New Gold Inc. needed to construct a large network of concrete tunnels and passageways beneath their target ore body.

The extraction and hauling activities within that area created an extremely abrasive situation for the concrete infrastructure — especially in the truck turning and dumping areas and rock chutes. By 2014, the original concrete in these areas had already worn out and needed to be replaced.

That indicated that the concrete would need to be replaced every three years, which would increase the mine’s maintenance costs significantly.

Solution

The replacement concrete used to remediate the truck turning and dumping areas and the rock chutes contained Kryton’s Hard-Cem admixture. Since then, the concrete in the area has resisted abrasion and has not needed to be replaced for more than six years of continuous service. As a result, with the help of Hard-Cem, New Gold Inc. has been able to skip at least two replacement events for their mine’s concrete. Without the need for this replacement, New Gold Inc. has also been able to avoid the process of creating additional concrete with cement, which has allowed them to reduce their lifetime carbon footprint by 49.5% so far.


Products and Systems Used:

Hard-Cem®

Hard-Cem is an Integral Hardening Admixture used to increase Abrasion and Erosion resistance of concrete. Hard-Cem is added to the concrete at the time of batching to increase the hardness of the concrete and extend concrete wear life. It outperforms and overcomes deficiencies of labor intensive surface applied hardeners, and is used to enhance durability...

View Details

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2025 Kryton International Inc.