Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • Sustainability & LEED
    • Courses
    • Brochures
    • Videos
  • Blog
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • eNewsletter
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

Projects: Case Studies

Case Study Library

Search using the fields below to find a project.

Reset Search Filter
Location: Toronto, ON, Canada
Developers: Talon International Development Inc. and The Trump Organization
Architect: Zeidler Architecture Inc.
Contractor: Lewis Builders Ltd.
Ready-Mix Supplier: Canada Building Materials
Distributor: Form & Build Supply
Download Case Study

The St. Regis Toronto

Toronto, ON, Canada

  • Home
  • Projects
  • Water Containment
  • The St. Regis Toronto

Eliminating Two Weeks Off of Project Scheduling for Waterproofing

Background

The St. Regis Toronto is one of the more luxurious buildings in Canada. As a 65-story tower, it has more than enough space to feature hotel rooms, residential suites, fine dining, a spa and wellness center, a meeting and event space, and a number of high-end services and furnishings.

However, with its height over 275 m (900 ft) above the city, the building faces major wind sway. To counterbalance the sway, construction workers added two large water tanks to the top of the building during the structure’s development. That ensured that when the building sways, water transfers between the two tanks to counteract the force.

Unfortunately, this solution came with a potential risk for leaking if it wasn’t properly waterproofed. As these two water tanks sit atop 65 floors of high-end real estate, luxury dining, and amenities, the amount of damage they could create if they leaked could be worth millions. They needed to be completely watertight. Leaks into multimillion-dollar apartments could not be tolerated.

Solution

Canada Building Materials presented Lewis Builders Ltd. with Kryton’s KIM concrete waterproofing admixture as a permanent waterproofing solution for the rooftop tanks. The contractor ended up going with this recommendation as KIM came with concrete self-sealing features and a 25-year warranty. It would also shave some time off the construction schedule. The contractor came to this last thought when they considered using a more traditional waterproofing membrane. With the extra application steps and complications not found with KIM, the membrane would have added two weeks to the contractor’s schedule and there was no guarantee that the traditional method would last for the life of the concrete.

With that in mind, they added KIM to the concrete mix to waterproof the water tanks. For protection elsewhere, they also did the same for the concrete of the indoor infinity salt water pool and whirlpool located on the 32nd floor. After all, the two spaces were directly above The St. Regis Toronto’s luxury STOCK restaurant and lounge, so a leak-free solution for both pool and whirlpool was absolutely critical.

To ensure the pool, whirlpool, and water tanks remained watertight, the contractor also added Kryton’s Krystol Waterstop System to the joints and tie holes around these structures.

Due to this careful waterproofing, The St. Regis Toronto remains standing dry and durable to this day.


Products and Systems Used:

Krystol Internal Membrane™ (KIM®)

Krystol Internal Membrane (KIM) is a hydrophilic crystalline admixture used to create permanently waterproof concrete.

View Details

Krystol Waterstop System

The Krystol Waterstop System is used to permanently waterproof concrete construction joints, pipe penetrations, tie holes and control joints. The Krystol Waterstop System works where other waterstops routinely fail. Kryton is the only integral waterproofing company that offers fully integrated concrete waterproofing solutions. [more_toggle title="How…

View Details

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2025 Kryton International Inc.